AI procurement criteria builder

Choose what you are buying and how far you want to go. Get tender questions that ask suppliers how they measure, report and cut the energy, carbon and water of their AI, with marking guides anyone can use.

Updated

In short

This tool writes the environmental part of an AI tender for you. By default it asks suppliers to describe how they measure, report and improve, and gives you plain-English marking guides, so you do not need to be an expert to score the answers. Switch on detailed reporting if your organisation needs the numbers, for example for CSRD or net zero reporting.

Every criterion is listed below. Turn on JavaScript to tailor the list and download the tender pack.

How it works

  1. Choose what you are buying. The criteria change for an AI API, a software product with AI features, custom development, hosting or hardware.
  2. Choose an ambition level. Starter asks for commitments, a self-declaration and a yearly improvement plan. Standard adds evidence about energy, carbon, water and hosting. Leading adds independent evidence and lifecycle questions.
  3. Decide whether you need detailed reporting. Leave it off unless someone in your organisation will use the figures. Switching it on adds key performance indicators (KPIs) with a set unit, method, boundary and reporting frequency.
  4. Review the criteria. Each one says why you are asking, what a good answer looks like, the red flags and how to mark it. Untick any you do not want.
  5. Download the pack: a tender annex, a supplier response form and an evaluation sheet.

The criteria follow our guide to sustainable AI procurement. Adapt the wording to your own procurement rules and have your legal or procurement team check the contract clauses.

Review the criteria

Minimum requirements

Pass or fail. A bid that does not meet a minimum requirement can be excluded.

Minimum requirementStarterCommitments, claims and regulation

Commitment and self-declaration

Name the person responsible for the environmental information in your bid. Confirm that the information you give is accurate to the best of your knowledge, that you say which figures are measured and which are estimated, and that you will tell us if any of it changes during the contract.

Applies to: AI API or model service · Software or SaaS with AI features · Custom AI development or integration · AI hosting, compute or cloud capacity · AI hardware

Help for the buyer
Why we ask

You cannot check everything a supplier says. A named contact and a signed self-declaration put the responsibility for accuracy on the supplier, and give you someone to ask.

What a good answer looks like

A named person with a relevant role, and an unqualified confirmation.

Red flags
  • No named person, or only a generic sales address.
  • The confirmation is qualified so heavily that it means nothing.
Marking guide
PassA named person and the confirmation are given.
FailEither is missing.

Learn more: Commitments, claims and regulation

Minimum requirementStarterCommitments, claims and regulation

Honest environmental claims

Confirm that any environmental claim you make about the offered service or product, such as "green", "sustainable" or "carbon neutral", can be backed by evidence you will share with us on request, and that you say clearly when a claim depends on offsets or renewable energy certificates.

Applies to: AI API or model service · Software or SaaS with AI features · Custom AI development or integration · AI hosting, compute or cloud capacity · AI hardware

Help for the buyer
Why we ask

Vague green claims are common and hard for a buyer to test. Asking for evidence up front protects you from repeating a claim you cannot support, which can breach consumer and advertising rules in many countries.

What a good answer looks like

A clear confirmation. Strong answers also point to where the evidence for current claims is published.

Red flags
  • Claims of carbon neutrality that rest only on offsets, without saying so.
  • Refusal to share evidence for claims made in marketing.
Marking guide
PassConfirmation given.
FailNo confirmation.

Learn more: Commitments, claims and regulation

Minimum requirementStandardHosting, data centres and water

Where the work will run

List the countries and cloud regions or data centres where our data will be stored and where the AI processing (including model inference by any subcontractor or model provider) will take place.

Applies to: AI API or model service · Software or SaaS with AI features · Custom AI development or integration · AI hosting, compute or cloud capacity

Help for the buyer
Why we ask

The carbon and water footprint of AI depends heavily on where it runs, because electricity grids and climates differ. You also need this for data protection, so it is rarely sensitive.

What a good answer looks like

A list of named regions or sites, including those of any model provider the supplier relies on.

Red flags
  • "Global infrastructure" with no locations.
  • Locations given for storage but not for AI processing.
Marking guide
PassLocations are listed for both storage and AI processing.
FailLocations are missing or too vague to identify a country.

Learn more: Hosting, data centres and water

Minimum requirementStandardHosting, data centres and water

EU data-centre reporting

If any data centre used to deliver this service is in the EU and has an installed IT power demand of at least 500 kW, confirm that its operator reports under the EU data-centre reporting scheme (Article 12 of the Energy Efficiency Directive (EU) 2023/1791 and Delegated Regulation (EU) 2024/1364), and give us the latest reported power usage effectiveness (PUE), water usage effectiveness (WUE) and renewable energy figures for those sites. If none of the data centres is covered, say so.

Applies to: AI API or model service · Software or SaaS with AI features · AI hosting, compute or cloud capacity

Help for the buyer
Why we ask

Operators of EU data centres of at least 500 kW already have to report energy, water and renewable energy indicators every year. Asking for figures that already exist adds little burden for the supplier and gives you comparable data.

What a good answer looks like

Site-level PUE, WUE and renewable energy figures for the latest reporting year, or a clear statement that no covered site is used.

Red flags
  • A company-wide average instead of figures for the sites used.
  • No answer about whether the sites are covered.
Marking guide
PassFigures given for covered sites, or a clear statement that none is covered.
FailNo answer, or covered sites without figures.

Sources: Directive (EU) 2023/1791 on energy efficiency (Article 12: data centres) · Commission Delegated Regulation (EU) 2024/1364 on the first phase of a common Union rating scheme for data centres · Energy performance of data centres

Learn more: Hosting, data centres and water

Minimum requirementStandardModels and efficiency

Energy information for general-purpose AI models

Name the AI models the service uses and who provides them. For any general-purpose AI model placed on the EU market, state whether you can share with us the model's known or estimated energy consumption, which its provider must document under the EU AI Act (Article 53 and Annex XI).

Applies to: AI API or model service · Software or SaaS with AI features · Custom AI development or integration

Help for the buyer
Why we ask

Since 2 August 2025, providers of general-purpose AI models in the EU must keep technical documentation that includes the model's known or estimated energy consumption. That documentation goes to the regulators on request rather than to customers, so you need to ask for it.

What a good answer looks like

Named models and providers, and either the energy figure or a clear explanation of why it cannot be shared.

Red flags
  • Refusal to name the models used.
  • A claim that the AI Act does not apply, with no reason given, when the model is used in the EU.
Marking guide
PassModels and providers named, and a clear answer on the energy figure.
FailModels not named, or no answer on energy.

Sources: AI Act, Article 53: obligations for providers of general-purpose AI models · AI Act, Annex XI: technical documentation for providers of general-purpose AI models · AI Act, Article 113: entry into force and application

Learn more: Models and efficiency

Minimum requirementStandardCommitments, claims and regulation

Organisation carbon reduction plan

Provide your organisation's current carbon reduction plan or climate transition plan, with your Scope 1 and Scope 2 emissions, the Scope 3 emissions you report, and your reduction targets.

Applies to: AI API or model service · Software or SaaS with AI features · Custom AI development or integration · AI hosting, compute or cloud capacity · AI hardware

Help for the buyer
Why we ask

A published plan shows the supplier measures its own emissions and has targets. In the UK, central government buyers already require a Carbon Reduction Plan for contracts worth £5 million a year or more (including VAT) under PPN 006, so many suppliers have one ready.

What a good answer looks like

A dated plan with emissions for a recent year, named Scope 3 categories and dated targets.

Red flags
  • Only a net zero pledge with no figures.
  • A plan more than two years old.
Marking guide
PassA plan with current Scope 1 and 2 emissions and dated targets.
FailNo plan, or a pledge without figures or targets.

Sources: PPN 006: Taking account of Carbon Reduction Plans in the procurement of major government contracts · GHG Protocol Scope 2 Guidance

Learn more: Commitments, claims and regulation

Minimum requirementStandardHardware and lifecycle

Ecodesign rules for servers and storage

Confirm that the servers and data storage products offered meet the ecodesign requirements of Regulation (EU) 2019/424 where it applies, and provide the product information it requires for each model offered.

Applies to: AI hardware

Help for the buyer
Why we ask

This regulation sets minimum power supply efficiency and material efficiency rules for servers and data storage sold in the EU, and requires product information. Asking for that information gives you a like-for-like basis for comparing bids. A version of the regulation is also retained in law in Great Britain.

What a good answer looks like

Confirmation plus the product information for each model.

Red flags
  • Products sold outside the regulation with no explanation.
Marking guide
PassConfirmation and product information given, or a clear reason the regulation does not apply.
FailNeither given.

Sources: Commission Regulation (EU) 2019/424: ecodesign requirements for servers and data storage products

Learn more: Hardware and lifecycle

Minimum requirementLeadingCommitments, claims and regulation

Environmental management system

Provide evidence of an environmental management system that covers the services offered: ISO 14001 certification or an equivalent system, with its scope.

Applies to: AI API or model service · Software or SaaS with AI features · Custom AI development or integration · AI hosting, compute or cloud capacity · AI hardware

Help for the buyer
Why we ask

A certified management system shows that environmental performance is managed and audited across the organisation, not just described in a bid. Accept equivalent systems, not only one named standard.

What a good answer looks like

A current certificate whose scope covers the services offered, or equivalent evidence.

Red flags
  • A certificate that covers a different part of the business.
Marking guide
PassCurrent certificate or equivalent covering the services offered.
FailNo evidence, or the scope does not cover the services.

Sources: ISO 14001 Environmental management systems

Learn more: Commitments, claims and regulation

Scored questions

Scored 0, 2, 3 or 4 with the marking guide, then weighted.

Scored questionStarterNeed and right-sizing

Is this kind of AI needed?

For each AI feature in your offer, explain why that kind of AI is needed for our requirement, and which simpler options (for example rules, search, or a smaller non-generative model) you considered and why you did or did not choose them.

Applies to: AI API or model service · Software or SaaS with AI features · Custom AI development or integration

Help for the buyer
Why we ask

Generative AI often uses much more computing than simpler methods for the same task. A supplier who has thought about the simplest tool that works is likely to deliver something cheaper and more efficient.

What a good answer looks like

Feature-by-feature reasons tied to your requirement, with simpler options named and honestly compared.

Red flags
  • Generative AI used for everything, with no alternatives considered.
  • General claims about AI's benefits that do not mention your requirement.
Marking guide
ScoreWhat it means
0No answer, or only general claims about AI.
2Reasons given for some features, with no real alternatives considered.
3Reasons for each feature, with simpler options considered.
4As 3, and the design uses simpler methods where they work, with evidence of the comparison.

Suggested weight: 2

Learn more: Need and right-sizing

Scored questionStarterNeed and right-sizing

Right-sized models and routing

Which model sizes or versions will be used for our work? Explain how you match the model to the task, for example by using smaller or task-specific models, or by routing simple requests to smaller models, and whether we can choose a smaller model where it meets our quality needs.

Applies to: AI API or model service · Software or SaaS with AI features · Custom AI development or integration

Help for the buyer
Why we ask

The biggest model is rarely needed for every request. Choosing a smaller model for simple tasks can cut energy and cost, often with little loss of quality, so it is one of the most useful things to ask about.

What a good answer looks like

Named models for different tasks, a described routing approach, and the option for you to choose.

Red flags
  • Only the largest model is offered.
  • No way for you to change the model later.
Marking guide
ScoreWhat it means
0No answer, or a single large model with no choice.
2Some choice of model, but no matching to the task.
3Models matched to tasks, with routing or a choice for us.
4As 3, with evidence (such as test results) that the smaller options meet quality needs.

Optional pass/fail minimum: At least one smaller or more efficient model option is available to us.

Suggested weight: 3

Learn more: Need and right-sizing

Scored questionStarterEnergy, carbon and measurement

How you measure, report and improve

Describe how you measure or estimate the energy use and greenhouse gas emissions of the service you are offering: what you measure, how often, which method or standard you follow, which figures are measured and which estimated, and how you use the results to improve.

Applies to: AI API or model service · Software or SaaS with AI features · Custom AI development or integration · AI hosting, compute or cloud capacity · AI hardware

Help for the buyer
Why we ask

This is the core question. You do not need to judge the numbers: you are checking whether the supplier has a real, repeatable way of knowing its footprint and acting on it. A supplier that measures can improve; one that does not usually cannot.

What a good answer looks like

A clear description of what is measured (for example the energy of the servers or accelerators that run the AI), how often, the method named (such as the Software Carbon Intensity specification), the boundary (what is included and left out), and an example of a change made because of the results.

Red flags
  • Only company-wide totals or a net zero pledge.
  • Figures with no method or boundary.
  • "We use renewable energy, so our emissions are zero."
Marking guide
ScoreWhat it means
0No answer, or only company-wide pledges.
2Some measurement or estimation described, but method or boundary unclear.
3Method, boundary and frequency explained, measured and estimated figures distinguished.
4As 3, with a named published method, examples of improvements made, and some independent checking.

Suggested weight: 3

Sources: Software Carbon Intensity (SCI) specification (ISO/IEC 21031:2024) · SCI for AI

Learn more: Energy, carbon and measurement

Scored questionStandardEnergy, carbon and measurement

Energy and emissions per unit of service

Give the energy use (in watt-hours) and greenhouse gas emissions (in grams of CO2 equivalent) per 1,000 requests for the service offered, say whether each figure is measured or estimated, and state the boundary: for example accelerators only, whole servers, idle capacity, data-centre overhead (PUE) and networking. If you cannot give a figure yet, explain when and how you will.

Applies to: AI API or model service · Software or SaaS with AI features · Custom AI development or integration · AI hosting, compute or cloud capacity

Help for the buyer
Why we ask

A figure per unit of work lets you compare suppliers and track improvement, unlike company totals. The boundary matters: a figure for the chips alone can be much lower than one that includes the whole server and the building.

What a good answer looks like

Figures per unit, labelled measured or estimated, with the boundary listed and the method named.

Red flags
  • A figure with no boundary, or only for the chips.
  • Emissions given as zero because of renewable energy certificates.
Marking guide
ScoreWhat it means
0No figure and no plan to provide one.
2A plan to provide figures, or figures without a stated boundary.
3Figures per unit with method and boundary.
4As 3, measured rather than estimated, with idle capacity and data-centre overhead included.

Optional pass/fail minimum: A figure per unit, or a dated commitment to provide one, with the method and boundary stated.

Suggested weight: 3

Sources: Software Carbon Intensity (SCI) specification (ISO/IEC 21031:2024) · AI Energy Score

Learn more: Energy, carbon and measurement

Scored questionStandardEnergy, carbon and measurement

Location-based and market-based carbon

Give the emissions of the service on both a location-based basis (the average carbon intensity of the grids where the electricity is used) and a market-based basis (reflecting your energy contracts and certificates). Describe the contracts and certificates behind the market-based figure, such as power purchase agreements or guarantees of origin, and whether they are matched hour by hour.

Applies to: AI API or model service · Software or SaaS with AI features · Custom AI development or integration · AI hosting, compute or cloud capacity

Help for the buyer
Why we ask

The two figures can differ greatly. The GHG Protocol's Scope 2 guidance asks companies to report both, and large companies reporting under the EU sustainability reporting standards (ESRS E1) must give both. The location-based figure shows the real effect on the grid; the market-based figure shows what the supplier has bought.

What a good answer looks like

Both figures, with the instruments named and the matching period stated.

Red flags
  • Only a market-based figure of zero.
  • Certificates bought from a different region or year, without saying so.
Marking guide
ScoreWhat it means
0No figures.
2One basis only.
3Both bases, with the instruments described.
4As 3, with hourly or regional matching evidence.

Optional pass/fail minimum: A location-based emissions figure is given.

Suggested weight: 2

Sources: GHG Protocol Scope 2 Guidance · Revised ESRS E1 Climate change

Learn more: Energy, carbon and measurement

Scored questionStandardHosting, data centres and water

Data-centre efficiency and energy sources

For each data centre that will run our work, give the power usage effectiveness (PUE) and the share of renewable energy for the last full year, say how they were measured (for example to ISO/IEC 30134-2 or EN 50600-4-2 for PUE), and describe the evidence for the renewable energy share.

Applies to: AI API or model service · Software or SaaS with AI features · Custom AI development or integration · AI hosting, compute or cloud capacity

Help for the buyer
Why we ask

PUE shows how much extra energy a building uses for cooling and power, on top of the computers. A figure for the actual sites is more useful than a company-wide average or a design target.

What a good answer looks like

Annual, measured, site-level PUE and renewable share, with the standard named.

Red flags
  • Design PUE or best-site PUE presented as typical.
  • Renewable claims with no evidence.
Marking guide
ScoreWhat it means
0No figures.
2Company-wide averages, or figures with no measurement period.
3Site-level annual figures with the method named.
4As 3, with evidence such as published EU data-centre reports or independent checks.

Optional pass/fail minimum: A PUE figure with its measurement period is given for each site.

Suggested weight: 2

Sources: ISO/IEC 30134 series: data centre key performance indicators (PUE, REF and others) · Commission Delegated Regulation (EU) 2024/1364 on the first phase of a common Union rating scheme for data centres

Learn more: Hosting, data centres and water

Scored questionStandardHosting, data centres and water

Water use

For each data centre that will run our work, give the water usage effectiveness (WUE, litres per kWh of IT energy) for the last full year, the method (for example ISO/IEC 30134-9 or EN 50600-4-9), the type of cooling, and whether the site is in an area of water stress. Say whether your figures include water used to generate the electricity.

Applies to: AI API or model service · Software or SaaS with AI features · Custom AI development or integration · AI hosting, compute or cloud capacity

Help for the buyer
Why we ask

Many data centres use water for cooling, which matters most where water is scarce. Water figures are now reported by large EU data centres, so they should be available.

What a good answer looks like

Site-level WUE with the method, cooling type and local water stress described.

Red flags
  • No water figures at all for sites in dry regions.
  • "Water positive" claims with no site figures.
Marking guide
ScoreWhat it means
0No information.
2Company-wide figures only.
3Site-level WUE with method and cooling type.
4As 3, with local water stress assessed and a plan to reduce water use.

Suggested weight: 2

Sources: ISO/IEC 30134-9:2022 Data centres key performance indicators, Part 9: Water usage effectiveness (WUE) · Commission Delegated Regulation (EU) 2024/1364 on the first phase of a common Union rating scheme for data centres

Learn more: Hosting, data centres and water

Scored questionLeadingHosting, data centres and water

Lower-carbon locations and timing

Can we choose to run our work in lower-carbon regions? Can work that is not urgent (such as batch processing or training) be moved to times or places with cleaner electricity? Describe what you offer and any effect on price or service levels.

Applies to: AI API or model service · Custom AI development or integration · AI hosting, compute or cloud capacity

Help for the buyer
Why we ask

The same work can have very different emissions depending on where and when it runs. Moving flexible work is one of the cheapest ways to cut emissions.

What a good answer looks like

A choice of regions with their grid carbon intensity, and a described option for flexible work.

Red flags
  • No choice of region at all.
Marking guide
ScoreWhat it means
0No choice offered.
2Region choice, with no carbon information.
3Region choice with carbon information, or carbon-aware timing for flexible work.
4Both, with reporting of the effect.

Suggested weight: 1

Learn more: Hosting, data centres and water

Scored questionStandardModels and efficiency

Efficiency built into the service

Describe the techniques you use to cut the computing needed per request, for example caching repeated answers, batching requests, quantisation or distillation of models, limits on prompt and output length, and retrieval in place of very long inputs. For AI agents, describe the limits on steps, tokens or spend per task, and how runaway loops are stopped.

Applies to: AI API or model service · Software or SaaS with AI features · Custom AI development or integration

Help for the buyer
Why we ask

Well-engineered AI uses much less computing for the same result. AI agents that call models many times can waste a lot if nothing stops them. Efficiency usually lowers cost too.

What a good answer looks like

Specific techniques named for this service, with limits for agents and an example of the saving.

Red flags
  • Agents with no limits on steps or cost.
  • General statements about "optimisation" with no detail.
Marking guide
ScoreWhat it means
0No answer.
2Some techniques named in general terms.
3Techniques specific to this service, and limits for agents where relevant.
4As 3, with measured savings.

Suggested weight: 2

Learn more: Models and efficiency

Scored questionStarterTransparency and control

AI features we can switch off

Can our administrators switch off AI features, for all users or for groups, without losing other functions? Which AI features run automatically by default (for example summaries generated whenever a document opens), and can those defaults be changed?

Applies to: Software or SaaS with AI features

Help for the buyer
Why we ask

AI features that run automatically for every user use energy whether or not anyone needs the result. Being able to switch them off or make them run only on request avoids waste.

What a good answer looks like

Admin controls per feature, and AI that runs on request rather than automatically.

Red flags
  • AI features that cannot be switched off.
  • Generation that runs in the background for every user by default.
Marking guide
ScoreWhat it means
0AI features cannot be switched off.
2All-or-nothing switch only.
3Per-feature or per-group controls.
4As 3, and AI runs on request by default.

Optional pass/fail minimum: An administrator can switch AI features off.

Suggested weight: 2

Learn more: Transparency and control

Scored questionStandardTransparency and control

Usage and energy data for our account

What usage information will you give us for our own account (for example requests, tokens, compute hours), and will you include estimated energy and emissions? How often, in what format, and can we export it?

Applies to: AI API or model service · Software or SaaS with AI features · Custom AI development or integration · AI hosting, compute or cloud capacity

Help for the buyer
Why we ask

Data about your own use lets you spot waste and report your footprint. It also helps you check whether the supplier's improvements reach you.

What a good answer looks like

Monthly account-level usage with energy and emissions estimates, exportable as CSV or through an API.

Red flags
  • Usage data only on request, or only as a PDF.
Marking guide
ScoreWhat it means
0No account-level data.
2Usage data without energy or emissions.
3Usage with energy and emissions estimates, at least quarterly.
4Monthly or more often, exportable, with the method explained.

Optional pass/fail minimum: Account-level usage data at least once a year.

Suggested weight: 2

Learn more: Transparency and control

Scored questionStandardModels and efficiency

Training disclosure for models

For the models used or delivered, give the training energy use and emissions, the hardware and where training took place, or point us to a model card that does. For models you train or fine-tune for us, commit to reporting these for our work.

Applies to: AI API or model service · Custom AI development or integration

Help for the buyer
Why we ask

Training a large model uses a lot of energy once; that cost is shared by everyone who uses the model. Model cards on platforms such as Hugging Face have a standard place to report it.

What a good answer looks like

Published training figures with hardware and location, and a commitment for any training done for you.

Red flags
  • No training information for a model the supplier trained itself.
Marking guide
ScoreWhat it means
0No information.
2Partial information, such as hardware but no energy.
3Energy or emissions, hardware and location given.
4As 3, published in a model card and covering fine-tuning done for us.

Suggested weight: 1

Sources: Displaying carbon emissions for your model · AI Act, Annex XI: technical documentation for providers of general-purpose AI models

Learn more: Models and efficiency

Scored questionStandardModels and efficiency

Energy as a design requirement

How will you treat energy use and running cost as requirements when you design and test the system for us? For example: setting an energy or cost budget per task, comparing candidate models on energy as well as accuracy, and measuring energy during acceptance testing.

Applies to: Custom AI development or integration

Help for the buyer
Why we ask

Most of an AI system's footprint is fixed by early design choices such as the model and architecture. Building energy into the requirements and the tests is far cheaper than fixing it later.

What a good answer looks like

A budget per task, a comparison of options on energy and quality, and energy measured in acceptance tests.

Red flags
  • Model chosen before the requirement is understood.
  • No measurement before go-live.
Marking guide
ScoreWhat it means
0No answer.
2Energy considered informally.
3A budget and a comparison of options on energy as well as quality.
4As 3, with energy measured in acceptance tests and reported to us.

Suggested weight: 3

Sources: Software Carbon Intensity (SCI) specification (ISO/IEC 21031:2024)

Learn more: Models and efficiency

Scored questionStandardHardware and lifecycle

Hardware life, reuse and recycling

How long is hardware used before it is replaced, how is it kept well used, and what happens to it at the end: reuse, refurbishment or recycling? How is data erased so that hardware can be reused?

Applies to: AI hosting, compute or cloud capacity · AI hardware

Help for the buyer
Why we ask

Making servers and accelerators has its own carbon footprint (embodied carbon). Using them longer and reusing them spreads that footprint over more work.

What a good answer looks like

Stated lifetimes, reuse before recycling, certified data erasure, and recycling in line with e-waste law.

Red flags
  • Hardware shredded by default rather than reused.
  • No information on what happens at end of life.
Marking guide
ScoreWhat it means
0No answer.
2Recycling only, with no lifetime or reuse information.
3Lifetimes, reuse and recycling described.
4As 3, with figures for reuse and a take-back service.

Suggested weight: 2

Sources: Directive 2012/19/EU on waste electrical and electronic equipment (WEEE)

Learn more: Hardware and lifecycle

Scored questionStandardHardware and lifecycle

Energy efficiency of the hardware

Give the idle and full-load power of the hardware offered and its performance per watt on a named, published benchmark that matches our intended use (for example MLPerf Power for AI work). Describe the power management features and their default settings.

Applies to: AI hardware

Help for the buyer
Why we ask

Hardware that does the same work with less power cuts running costs and emissions for its whole life. A published benchmark lets you compare bids fairly.

What a good answer looks like

Measured power figures, published benchmark results and power saving switched on by default.

Red flags
  • Peak performance quoted with no power figure.
  • Benchmarks that do not match the intended use.
Marking guide
ScoreWhat it means
0No figures.
2Power figures without a benchmark.
3Power figures and performance per watt on a published benchmark.
4As 3, independently published, with power management on by default.

Suggested weight: 2

Sources: MLPerf Power: benchmarking the energy efficiency of machine learning systems from microwatts to megawatts · Commission Regulation (EU) 2019/424: ecodesign requirements for servers and data storage products

Learn more: Hardware and lifecycle

Scored questionLeadingHardware and lifecycle

Embodied carbon

Give the embodied emissions (from manufacture and transport) of the main hardware used or offered, the method used, and how you share those emissions across the work done, for example as the embodied term of a Software Carbon Intensity score.

Applies to: AI hosting, compute or cloud capacity · AI hardware

Help for the buyer
Why we ask

Embodied carbon is often left out of AI footprints. The cleaner the electricity, the larger its share of the total becomes.

What a good answer looks like

Product carbon footprints by a published life-cycle method, and a clear allocation to the service.

Red flags
  • Embodied emissions ignored because "we use renewable energy".
Marking guide
ScoreWhat it means
0No information.
2Generic industry figures only.
3Product-specific figures with a named method.
4As 3, allocated to the service and independently checked.

Suggested weight: 2

Sources: Software Carbon Intensity (SCI) specification (ISO/IEC 21031:2024)

Learn more: Hardware and lifecycle

Scored questionStarterImprovement, reporting and exit

Improvement plan

Set out your plan to reduce the energy, emissions and (where relevant) water used per 1,000 requests over the contract: the targets, the actions, the dates, and how you will report progress to us each year.

Applies to: AI API or model service · Software or SaaS with AI features · Custom AI development or integration · AI hosting, compute or cloud capacity · AI hardware

Help for the buyer
Why we ask

A plan turns good intentions into commitments you can follow up. Targets per unit of work show real efficiency, unlike total figures that change with how much the service is used.

What a good answer looks like

Targets per unit with dates, specific actions, and a yearly progress report.

Red flags
  • Targets only for company totals, or only through offsets.
  • No dates.
Marking guide
ScoreWhat it means
0No plan.
2General intentions with no targets or dates.
3Targets per unit with actions and dates.
4As 3, with a baseline, interim milestones and past results that show delivery.

Optional pass/fail minimum: At least one measurable target per unit of work, with a date.

Suggested weight: 3

Learn more: Improvement, reporting and exit

Scored questionLeadingCommitments, claims and regulation

Independent and comparable evidence

What independent or comparable evidence supports your environmental figures? For example: published AI Energy Score ratings for the models used, MLPerf Power results, a published Software Carbon Intensity score, external assurance of your emissions reporting, or an ecolabel.

Applies to: AI API or model service · Software or SaaS with AI features · Custom AI development or integration · AI hosting, compute or cloud capacity · AI hardware

Help for the buyer
Why we ask

Independent or standard evidence means you do not have to take the supplier's word for it, and lets you compare suppliers on the same basis.

What a good answer looks like

Published, recent results on a named benchmark, or assurance by a third party, covering the service offered.

Red flags
  • Awards or rankings with no method.
  • Evidence that covers a different product.
Marking guide
ScoreWhat it means
0None.
2Self-published results with a named method.
3Results on a public benchmark or third-party assurance for part of the service.
4Independent evidence covering the service offered.

Suggested weight: 1

Sources: AI Energy Score · MLPerf Power: benchmarking the energy efficiency of machine learning systems from microwatts to megawatts · Software Carbon Intensity (SCI) specification (ISO/IEC 21031:2024)

Learn more: Commitments, claims and regulation

Detailed reporting requirements

Added only when detailed reporting is switched on. Bidders commit to report each indicator exactly as specified.

Detailed reporting (KPI)StandardEnergy, carbon and measurement

Energy per unit of service

Report the energy used per 1,000 requests for our usage.

Unit
Wh per 1,000 requests
Method
Measured from server and accelerator power telemetry where available, otherwise estimated by a stated model; idle and reserved capacity shared in proportion to use; multiplied by the site's PUE for the same period. Label each figure measured or estimated.
Boundary
Compute (accelerators, CPUs, memory), storage and data-centre networking used for our work, idle and reserved capacity, and data-centre overhead. Exclude end-user devices and public internet transfer, and say so.
Reporting frequency
Quarterly, with monthly values; annual summary within 60 days of each contract year.

Applies to: AI API or model service · Software or SaaS with AI features · Custom AI development or integration · AI hosting, compute or cloud capacity

Help for the buyer
Why we ask

The basic efficiency indicator. Tracking it per unit shows whether the service is getting more efficient.

What a good answer looks like

Monthly values on a consistent boundary, with method changes flagged and past figures restated.

Red flags
  • Boundary changes from report to report.
Marking guide
PassCommits to report on this basis.
FailDoes not commit, or changes the unit, method or boundary.

Sources: Software Carbon Intensity (SCI) specification (ISO/IEC 21031:2024) · ISO/IEC 30134 series: data centre key performance indicators (PUE, REF and others)

Learn more: Energy, carbon and measurement

Detailed reporting (KPI)StandardEnergy, carbon and measurement

Emissions per unit of service

Report the greenhouse gas emissions per 1,000 requests for our usage, location-based and market-based.

Unit
g CO2e per 1,000 requests (location-based and market-based)
Method
Energy per unit multiplied by grid carbon intensity. Location-based: the average intensity of the grid where the electricity is used, hourly where available, with the data source named. Market-based: following the GHG Protocol Scope 2 guidance. Optionally also as a Software Carbon Intensity (SCI) score, which certificates and offsets cannot reduce.
Boundary
As for energy per unit, plus embodied emissions of the hardware where reported as an SCI score.
Reporting frequency
Quarterly, with monthly values.

Applies to: AI API or model service · Software or SaaS with AI features · Custom AI development or integration · AI hosting, compute or cloud capacity

Help for the buyer
Why we ask

Shows the climate effect of your use, on the basis the GHG Protocol and ESRS E1 ask for.

What a good answer looks like

Both bases each quarter, with the grid data source and certificates named.

Red flags
  • Market-based figure only.
Marking guide
PassCommits to report both bases with the method stated.
FailDoes not commit to both bases.

Sources: GHG Protocol Scope 2 Guidance · Software Carbon Intensity (SCI) specification (ISO/IEC 21031:2024) · SCI for AI · Revised ESRS E1 Climate change

Learn more: Energy, carbon and measurement

Detailed reporting (KPI)StandardTransparency and control

Totals for our account

Report the total energy and emissions attributable to our usage, for our own carbon reporting.

Unit
kWh; kg CO2e location-based and market-based
Method
The per-unit figures multiplied by our usage, using the same method and boundary as the per-unit KPIs.
Boundary
Our account or contract only.
Reporting frequency
Quarterly, and annually within 60 days of our financial year end, in CSV or another open format.

Applies to: AI API or model service · Software or SaaS with AI features · Custom AI development or integration · AI hosting, compute or cloud capacity

Help for the buyer
Why we ask

Organisations that report their own value-chain (Scope 3) emissions, for example under the EU sustainability reporting standards, need figures for what they buy.

What a good answer looks like

Figures that add up to the per-unit values times usage, delivered on time in an open format.

Red flags
  • Totals that cannot be reconciled with usage.
Marking guide
PassCommits to report on this basis.
FailDoes not commit.

Sources: Revised ESRS E1 Climate change · GHG Protocol Scope 2 Guidance

Learn more: Transparency and control

Detailed reporting (KPI)StandardHosting, data centres and water

Power usage effectiveness (PUE) per site

Report the PUE of each data centre that runs our work.

Unit
Ratio (total facility energy ÷ IT equipment energy)
Method
ISO/IEC 30134-2 or EN 50600-4-2, measured over the full year, not a design value.
Boundary
Each site used for our work, not a company-wide average.
Reporting frequency
Annually; for EU sites, the figures reported under Delegated Regulation (EU) 2024/1364.

Applies to: AI API or model service · Software or SaaS with AI features · AI hosting, compute or cloud capacity

Help for the buyer
Why we ask

Shows the overhead of the buildings that run your work.

What a good answer looks like

Annual measured PUE per site.

Red flags
  • Design or best-quarter values.
Marking guide
PassCommits to report on this basis.
FailDoes not commit.

Sources: ISO/IEC 30134 series: data centre key performance indicators (PUE, REF and others) · Commission Delegated Regulation (EU) 2024/1364 on the first phase of a common Union rating scheme for data centres

Learn more: Hosting, data centres and water

Detailed reporting (KPI)StandardHosting, data centres and water

Water use per site

Report the water usage effectiveness and water use of each data centre that runs our work.

Unit
WUE in litres per kWh of IT energy; total and drinking-water input in cubic metres
Method
ISO/IEC 30134-9 or EN 50600-4-9, stating the category used (the EU reporting scheme prefers Category 2), over the full year.
Boundary
Each site used for our work. State whether water used to generate electricity is included.
Reporting frequency
Annually.

Applies to: AI API or model service · Software or SaaS with AI features · AI hosting, compute or cloud capacity

Help for the buyer
Why we ask

Shows how much water the buildings that run your work consume, which matters most where water is scarce.

What a good answer looks like

Annual WUE and water input per site, with the category stated.

Red flags
  • Company-wide figures only.
Marking guide
PassCommits to report on this basis.
FailDoes not commit.

Sources: ISO/IEC 30134-9:2022 Data centres key performance indicators, Part 9: Water usage effectiveness (WUE) · Commission Delegated Regulation (EU) 2024/1364 on the first phase of a common Union rating scheme for data centres

Learn more: Hosting, data centres and water

Detailed reporting (KPI)StandardHosting, data centres and water

Renewable energy share per site

Report the share of renewable energy used by each data centre that runs our work, and how it is sourced.

Unit
Renewable energy factor (REF, 0 to 1), split by guarantees of origin, power purchase agreements and on-site generation
Method
ISO/IEC 30134-3 or EN 50600-4-3, with sourcing split as in Delegated Regulation (EU) 2024/1364; hourly matched share if available.
Boundary
Each site used for our work.
Reporting frequency
Annually.

Applies to: AI API or model service · Software or SaaS with AI features · AI hosting, compute or cloud capacity

Help for the buyer
Why we ask

Shows how much of the electricity is renewable, and whether it comes from certificates or new supply.

What a good answer looks like

Annual REF per site with the sourcing split.

Red flags
  • A single company-wide "100% renewable" figure.
Marking guide
PassCommits to report on this basis.
FailDoes not commit.

Sources: ISO/IEC 30134 series: data centre key performance indicators (PUE, REF and others) · Commission Delegated Regulation (EU) 2024/1364 on the first phase of a common Union rating scheme for data centres

Learn more: Hosting, data centres and water

Detailed reporting (KPI)LeadingHardware and lifecycle

Hardware lifetime and end of life

Report the lifetime and end-of-life outcomes of the hardware used for, or supplied to, us.

Unit
Average service life in years; % of retired units reused, refurbished and recycled (by number or weight); embodied kg CO2e per unit where known
Method
From asset records; embodied emissions from product carbon footprints by a published life-cycle method.
Boundary
Hardware used for our work, or supplied under this contract.
Reporting frequency
Annually, and at the end of the contract.

Applies to: AI hosting, compute or cloud capacity · AI hardware

Help for the buyer
Why we ask

Shows whether hardware is used for as long as possible and reused rather than scrapped.

What a good answer looks like

Figures from asset records with the method stated.

Red flags
  • Only recycling certificates, with no reuse figures.
Marking guide
PassCommits to report on this basis.
FailDoes not commit.

Sources: Directive 2012/19/EU on waste electrical and electronic equipment (WEEE) · Software Carbon Intensity (SCI) specification (ISO/IEC 21031:2024)

Learn more: Hardware and lifecycle

Contract clauses

Wording for the contract, so commitments last beyond the tender.

Contract clauseStarterImprovement, reporting and exit

Annual improvement plan and report

Within 60 days of the end of each contract year, the Supplier will give the Buyer a short report on the environmental performance of the service: progress against its improvement plan, the figures it has committed to provide, the methods used, and an updated plan for the coming year. If the Supplier changes a measurement method, it will say so in the report and restate the previous year's figures on the new basis.

Applies to: AI API or model service · Software or SaaS with AI features · Custom AI development or integration · AI hosting, compute or cloud capacity · AI hardware

Help for the buyer
Why we ask

Keeps the commitments in the bid alive for the length of the contract, at low cost to both sides.

Red flags
  • Supplier wants reporting to be "on request" only.

Learn more: Improvement, reporting and exit

Contract clauseStandardImprovement, reporting and exit

Access to usage and environmental data

The Supplier will give the Buyer access to usage and environmental data for the Buyer's account in an open, machine-readable format (such as CSV or JSON), at the frequency agreed in the contract. The Buyer may use this data in its own reporting. Data that the Supplier marks as commercially sensitive will be treated as confidential, but may be shared with the Buyer's auditors and regulators.

Applies to: AI API or model service · Software or SaaS with AI features · Custom AI development or integration · AI hosting, compute or cloud capacity

Help for the buyer
Why we ask

Makes the data you were promised usable for your own reporting and checks, while protecting the supplier's confidential information.

Red flags
  • Data only in dashboards that cannot be exported.

Learn more: Improvement, reporting and exit

Contract clauseStandardImprovement, reporting and exit

Where the work runs

The Supplier will run the Buyer's workloads in the regions listed in the contract. It will give the Buyer at least 60 days' notice before moving them elsewhere, and will not move them to a region with a higher grid carbon intensity without the Buyer's agreement, except in an emergency.

Applies to: AI API or model service · Software or SaaS with AI features · Custom AI development or integration · AI hosting, compute or cloud capacity

Help for the buyer
Why we ask

Stops the footprint of the service rising quietly after the contract is signed.

Red flags
  • A right to move workloads anywhere without notice.

Learn more: Improvement, reporting and exit

Contract clauseStandardImprovement, reporting and exit

Model choice and switching off AI

The Buyer may choose smaller or more efficient models where they meet the agreed quality levels, and may switch off AI features it does not need, without penalty. If the Supplier replaces a model, it will tell the Buyer in advance and say how the change affects energy use per unit.

Applies to: AI API or model service · Software or SaaS with AI features · Custom AI development or integration

Help for the buyer
Why we ask

Keeps you in control of the biggest factor in AI energy use: which model runs, and whether it runs at all.

Red flags
  • Model changes without notice.

Learn more: Improvement, reporting and exit

Contract clauseStarterImprovement, reporting and exit

Environmental claims

The Supplier will not describe the service to the Buyer, or the Buyer's use of it, as "green", "carbon neutral", "sustainable" or similar unless it can provide the evidence for the claim on request, and will say clearly when a claim relies on offsets or certificates.

Applies to: AI API or model service · Software or SaaS with AI features · Custom AI development or integration · AI hosting, compute or cloud capacity · AI hardware

Help for the buyer
Why we ask

Protects you from repeating claims you cannot support. See our guide to honest green claims.

Red flags
  • Supplier wants to use your name in green marketing without evidence.

Learn more: Improvement, reporting and exit

Contract clauseStandardImprovement, reporting and exit

Checks and review

Once a year, the Buyer may ask for the evidence behind any environmental figure or claim the Supplier has provided. If a check finds a figure materially wrong, the Supplier will correct and restate it and pay the reasonable cost of the check. The parties will review environmental performance each year, and may renegotiate if energy or emissions per unit rise.

Applies to: AI API or model service · Software or SaaS with AI features · Custom AI development or integration · AI hosting, compute or cloud capacity · AI hardware

Help for the buyer
Why we ask

Lets you check claims without having to be an expert, and gives you a lever if performance gets worse.

Red flags
  • No right to see evidence.

Learn more: Improvement, reporting and exit

Contract clauseStarterImprovement, reporting and exit

Exit and portability

At the end of the contract, the Supplier will return the Buyer's data, configurations, prompts and, where the Buyer paid for them, fine-tuned models and their documentation, in open formats, and will then delete the Buyer's data and confirm the deletion in writing. Exit help will be provided at the rates in the contract.

Applies to: AI API or model service · Software or SaaS with AI features · Custom AI development or integration · AI hosting, compute or cloud capacity

Help for the buyer
Why we ask

Being able to leave lets you move to a more efficient supplier later, and keeps competition alive. Without it, a supplier has little reason to improve.

Red flags
  • Fine-tuned models paid for by you that you cannot take away.
  • Exit fees not set in advance.

Learn more: Improvement, reporting and exit

Contract clauseStandardImprovement, reporting and exit

End of life for hardware

When hardware used for, or supplied to, the Buyer is retired, the Supplier will offer it for reuse or refurbishment before recycling, erase data using a recognised method, and recycle the rest in line with the e-waste law that applies, providing certificates on request.

Applies to: AI hosting, compute or cloud capacity · AI hardware

Help for the buyer
Why we ask

Reuse keeps the embodied carbon of hardware working for longer. Certified erasure makes reuse safe.

Red flags
  • Shredding by default.

Sources: Directive 2012/19/EU on waste electrical and electronic equipment (WEEE)

Learn more: Improvement, reporting and exit

Laws and standards behind the criteria

The criteria point to rules and standards where they already apply, so suppliers can often reuse information they have to produce anyway:

  • EU AI Act. Since 2 August 2025, providers of general-purpose AI models must keep technical documentation that includes the model's known or estimated energy consumption (Article 53 and Annex XI). It is provided to the AI Office and national authorities on request; the information providers must pass to businesses that build on the model (Annex XII) does not include energy, so buyers need to ask.
  • EU data-centre reporting. Under Article 12 of the Energy Efficiency Directive and Delegated Regulation (EU) 2024/1364, operators of EU data centres with at least 500 kW of installed IT power report energy, water and renewable energy data each year (by 15 May, for the previous calendar year), from which PUE, WUE, the energy reuse factor and the renewable energy factor are calculated. In September 2026 the Commission proposed a rating scheme for data centres.
  • EU sustainability reporting (CSRD). After the Omnibus I amendments (Directive (EU) 2026/470), the obligation to report covers EU companies with more than 1,000 employees and a net turnover above €450 million. The revised climate standard, ESRS E1, asks for energy consumption and gross Scope 1, 2 and 3 emissions, with Scope 2 both location-based and market-based. Buyers that report need figures from their suppliers: switch on detailed reporting.
  • UK public buyers. PPN 006 requires a Carbon Reduction Plan from bidders for in-scope central government contracts worth £5 million a year or more (including VAT).
  • Standards. PUE, WUE and the renewable energy factor are defined in the ISO/IEC 30134 series (and the matching EN 50600-4 series that EU reporting uses). The Software Carbon Intensity specification is published as ISO/IEC 21031:2024, and the Green Software Foundation's SCI for AI extends it to AI systems. Hugging Face's AI Energy Score rates models by the GPU energy they use per 1,000 queries on a standard test.
  • EU green public procurement. The European Commission's voluntary GPP criteria for data centres, server rooms and cloud services (2020) are a useful companion for hosting contracts.

These criteria are a starting point, not legal advice. Check them against the procurement law and policies that apply to you (for example, public buyers must usually accept equivalent evidence to any standard they name).

Inspired by the work of the Buyer Group Software, part of the Dutch-Flemish Buyer Group ICT supported by PIANOo, and its procurement criteria tool for software and cloud services developed with IDED and Leitmotiv (about the project). We have not used their text or indicators. Our criteria are written from public standards and our own guidance, and focus on AI.

Frequently asked questions

Do I need to understand energy measurement to use this?

No. The default criteria ask suppliers to explain how they measure, report and improve, and each one has a marking guide in plain English. Detailed reporting, with set units and methods, is optional.

How much weight should sustainability get in an AI tender?

That is your decision and may be set by your organisation's policy. The tool asks you for a share of the total score and splits it across the questions you include. Even a modest weighting tells the market that energy and carbon matter.

What if suppliers say their figures are commercially sensitive?

Ask anyway, and score the answer. The questions accept estimates when they are labelled and the method is explained, and the contract clauses let you receive account-level data in confidence.

Can I use these criteria for free?

Yes. Copy, adapt and use them in your own tenders. They are published under the same licence as the rest of greenai.guide's text.

Sources

  1. GHG Protocol Scope 2 Guidance, GHG Protocol (2015)
  2. Software Carbon Intensity (SCI) specification (ISO/IEC 21031:2024), Green Software Foundation (2024)
  3. SCI for AI, Green Software Foundation (2025)
  4. AI Energy Score, Hugging Face (2025)
  5. MLPerf Power: benchmarking the energy efficiency of machine learning systems from microwatts to megawatts, MLCommons (arXiv:2410.12032) (2024)
  6. Displaying carbon emissions for your model, Hugging Face Hub documentation (2025)
  7. ISO/IEC 30134 series: data centre key performance indicators (PUE, REF and others), ISO/IEC (2026)
  8. ISO/IEC 30134-9:2022 Data centres key performance indicators, Part 9: Water usage effectiveness (WUE), ISO/IEC (2022)
  9. Directive (EU) 2023/1791 on energy efficiency (Article 12: data centres), EUR-Lex (2023)
  10. Commission Delegated Regulation (EU) 2024/1364 on the first phase of a common Union rating scheme for data centres, EUR-Lex (2024)
  11. Energy performance of data centres, European Commission (2026)
  12. AI Act, Article 53: obligations for providers of general-purpose AI models, European Commission AI Act Service Desk (2024)
  13. AI Act, Annex XI: technical documentation for providers of general-purpose AI models, European Commission AI Act Service Desk (2024)
  14. AI Act, Article 113: entry into force and application, European Commission AI Act Service Desk (2024)
  15. Directive (EU) 2026/470 amending the Corporate Sustainability Reporting Directive and other directives (Omnibus I), EUR-Lex (2026)
  16. Revised ESRS E1 Climate change, EFRAG (2026)
  17. Commission Regulation (EU) 2019/424: ecodesign requirements for servers and data storage products, EUR-Lex (2019)
  18. Directive 2012/19/EU on waste electrical and electronic equipment (WEEE), EUR-Lex (2012)
  19. PPN 006: Taking account of Carbon Reduction Plans in the procurement of major government contracts, UK Government (2025)
  20. ISO 14001 Environmental management systems, ISO (2015)
  21. EU green public procurement criteria for data centres, server rooms and cloud services, European Commission (2020)
  22. Thinking about using AI? Here's what you can and (probably) can't change about its environmental impact, Green Web Foundation (2024)

Join us

Help cut AI's impact on the planet

Get new guides, funding calls and directory listings by email, about once a month. Or add your product, course, PhD or research to the directories.

No tracking. Unsubscribe in one click. Other ways to join · Privacy