# Reusing data-centre waste heat: when it makes sense

> Data centres turn almost all their electricity into heat. When reusing it works, when it doesn't, how it is measured and what EU and UK rules say.

Source: https://greenai.guide/articles/data-centre-waste-heat/  
Updated: 2026-11-26

## In short

Almost all the electricity a data centre uses ends up as heat, but that heat is low-grade, so it usually needs a heat pump and a nearby user who wants heat for most of the year. It works best feeding district heating networks, low-temperature industrial and farming processes, and swimming pools. Reported reuse is still rare: the European Commission found about 1.8% of EU data-centre heat was reused in the first reporting period. Heat reuse is measured separately from PUE, and it does not make the computing inside the building any more efficient.

## Key points

- The European Commission's 2026 report says practically all electricity consumed by a data centre eventually turns to heat, yet only about 1.8% of that heat was reported as reused in the EU.
- Data-centre heat is low-grade: the EU median reported waste heat temperature was 25 °C, so most schemes use heat pumps to raise it for heating networks.
- Reuse makes sense where there is a heat user close by with steady demand: a district heating network, a low-temperature industrial or farming process, or a swimming pool.
- Heat reuse is measured by the energy reuse factor (ERF), the share of a data centre's energy reused outside it; it must not be folded into PUE.
- EU law requires data centres above 1 MW to use their waste heat unless they show it is not technically or economically feasible; Germany sets minimum reuse shares for new data centres, and England plans to let heat network zones require connection.

**Reusing a data centre's waste heat makes sense when someone close by needs low-temperature heat for most of the
year, such as a district heating network, a fish farm or greenhouse, or a swimming pool.** Reuse puts energy that is
otherwise thrown away to work, but it does not cut the electricity a data centre uses or make the AI inside it more
efficient.

This article builds on [green AI hosting and data centres](/practice/hosting-and-data-centres/), which introduces
PUE, WUE and the energy reuse metrics. For what the electricity demand means for power networks, see
[data centres and the grid](/articles/data-centres-and-the-grid/).

## Where does data-centre heat come from, and how much is there?

**Nearly all of it: the European Commission's 2026 report on EU data centres says "practically all electricity
consumed by a data centre eventually turns to heat".** Processors, memory, storage and power equipment turn
electricity into heat, and the cooling system carries it away, usually to the outside air.

Very little of it is used. In its September 2026 report to the European Parliament and Council, the Commission found
that only 67 data centres reported any waste heat reuse in the first reporting period (2024 data), and that about
1.8% of the heat generated by EU data centres was reused. The Commission cautions that the figure may not be fully
representative, and notes that reuse from small sites is typically not economically feasible.

The potential is larger: the Commission said in September 2026 that reusing around half of European data centres'
waste heat would correspond to the heating demand of four million households.

## Why is data-centre heat hard to use?

**Because it is warm rather than hot, and heat loses value with distance and season.** Heating networks need hotter
water than a data centre gives off, so the heat usually has to be raised by a heat pump, which uses electricity.

- **Air cooling gives low temperatures.** Data centres in the EU report an average "waste heat temperature" under
  Delegated Regulation 2024/1364, measured where the warmed cooling fluid leaves the computer room. The
  Commission's first technical report on the 2024 data gives an EU median of 25 °C.
- **Liquid cooling gives warmer heat.** A 2021 white paper from ASHRAE, the engineering body behind the main
  data-centre cooling guidelines, describes the SuperMUC-NG supercomputer in Garching, Germany, cooled directly with
  water at 40 °C to 45 °C. Warmer water needs less upgrading.
- **Heat pumps bridge the gap.** In Odense, Denmark, Ramboll, which designed the plant for the local heat company,
  says large electric ammonia heat pumps raise data-centre heat to 70 °C to 75 °C for the city's district heating.
- **Demand is seasonal.** The Commission notes that heat reuse demand is lower in warm climates and that "even in
  regions with high heating demand, the seasonality of demand remains a major barrier". Data centres produce heat all
  year; homes want it mostly in winter.

## Where does reusing data-centre heat work best?

**Where four conditions line up: a heat user close by, demand for most of the year, a temperature the heat can reach
cheaply, and a scale that matches the data centre's output.** Three kinds of user meet them most often.

### District heating networks

**How it works:** a district heating network carries hot water through insulated pipes to many buildings. Heat from
the data centre's cooling passes through a heat exchanger and a heat pump into the network. New developments can be
designed around such a network from the start.

**Conditions:** an existing or planned network near the data centre; a heat pump, because network temperatures are
usually well above what the data centre gives off; and a network large enough to take the heat in summer as well as
winter.

**Benefits and limits:** one connection can serve thousands of homes and displace fossil-fuelled heat. But the network
must exist, or be built, and in summer the heat may exceed what the network can use.

**Examples:**

- **Stockholm, Sweden.** Stockholm Data Parks was set up in January 2017 by the City of Stockholm, the heat utility
  Stockholm Exergi, the fibre network Stokab and the power distributor Ellevio. Stockholm Exergi says it is heating
  11,000 apartments with excess heat, and that it pays data centres for heat based on what equivalent heat would
  have cost it to produce, with payments depending on outdoor temperature: about two million Swedish kronor a year
  for 1 MW of heat deliveries (figures from its website, as listed on 26 November 2026).
- **Odense, Denmark.** Meta's data centre feeds the network of the heat company Fjernvarme Fyn. In July 2020 Meta
  described a goal of recovering 100,000 MWh of energy a year, enough to warm 6,900 homes, with up to 25 MW of
  usable heat. Ramboll reported that the scheme served more than 12,000 homes in 2023.
- **Espoo, Finland.** The City of Espoo said in December 2023 that, once Microsoft's planned data centres operate at
  full capacity, their waste heat will cover around 40% of the heat needed by about 250,000 district heating users in
  Espoo, Kauniainen and Kirkkonummi, distributed by the energy company Fortum.

### Industrial and farming processes

**How it works:** heat goes directly, or through a short pipe, to a business that needs low-temperature heat for its
own process, such as fish farming or greenhouses.

**Conditions:** a process that needs heat at temperatures the data centre can supply, ideally all year; a site very
close by; and a heat demand comparable to the data centre's output.

**Benefits and limits:** year-round processes avoid the summer problem. But a single user is a single point of
failure, and many industrial processes need far hotter heat than a data centre provides.

**Examples:**

- **Rjukan, Norway.** The data-centre operator Green Mountain and the land-based trout farm Hima Seafood are 800
  metres apart. Green Mountain said in February 2026 that the system went operational in autumn 2025 and was being
  tested at up to 1.75 MW, with a second phase aiming for 8 MW; after use, the cooled water can return to the data
  centre's cooling.
- **Greenhouses.** Choose Paris Region, the Paris Region's investment agency, said in February 2023 that heat from
  Equinix's PA10 data centre in Saint-Denis would also heat a greenhouse on the data centre's roof. In the
  Netherlands, the government agency RVO describes a planned project in Aalsmeer to supply warm water from a data
  centre to a grower, a swimming pool, a sports hall and a school.

### Swimming pools and leisure centres

**How it works:** pools need warm water every day of the year, at temperatures close to what a data centre gives off.
Small data centres can sit on site and feed the pool's hot water system, or a larger data centre can supply a pool
through a heat network.

**Conditions:** a pool next to, or on the same network as, the data centre; a unit sized to the pool's demand; and a
backup heat source.

**Benefits and limits:** demand is steady all year and the temperature match is good, so upgrading needs are small.
Each pool takes only a small amount of heat, so this suits small data centres, not large ones.

**Examples:**

- **Exmouth, England.** East Devon District Council announced in March 2023 that a small data centre run by the
  company Deep Green, with 12 servers cooled by immersion in liquid, would cut the pool's gas requirements by 62%,
  saving the operator LED Community Leisure over £30,000 a year and reducing carbon emissions by 25.8 tonnes.
- **Saint-Denis, France.** Choose Paris Region said in February 2023 that waste heat from Equinix's PA10 would go into
  Saint-Denis's heating network to heat the Olympic Aquatic Centre and nearby buildings in the Plaine Saulnier
  development from 2024, recovering 6.6 MW and producing an additional 10,800 MWh of heat.

## When does heat reuse not make sense?

**When there is no user near enough, no network to carry the heat, or when a data centre is put in the wrong place
just to sell its heat.**

- **No heat network, and none planned.** The German government's 2026 bill notes that sites with enough grid capacity
  for large AI data centres often lack a suitable heat network.
- **Distance.** The further heat travels, the more pipework it needs and the more heat is lost.
- **Summer surplus.** In warm climates, the Commission notes, cooling needs coincide with "very low to zero heating
  needs".
- **Siting for heat alone.** A data centre placed for its heat where the grid is strained, power is carbon-intensive
  or water is scarce can do more harm than its heat does good. Heat is one factor in
  [siting decisions](/practice/hosting-and-data-centres/), alongside grid, clean electricity and water.

## How is heat reuse measured?

**By the energy reuse factor (ERF): the energy reused outside the data centre divided by the data centre's total
energy use.** ERF runs from 0 (nothing reused) to 1 (everything reused). It is defined in ISO/IEC 30134-6, published in
August 2021 and listed by ISO as due for revision, and in the European standard EN 50600-4-6.

- **The EU counts only heat used outside the building.** Delegated Regulation 2024/1364 requires EU data centres to
  measure heat "used or reused outside of the data centre boundary", at the point where it is handed to the other
  party, and to subtract any heat reused to cool the data centre itself.
- **ERE is the related metric.** The Green Grid's energy reuse effectiveness (ERE) subtracts reused energy from total
  facility energy before dividing by IT energy, so ERE equals PUE times (1 − ERF). Unlike PUE, ERE can fall below 1.0.
- **Never fold reuse into PUE.** The Green Grid introduced ERE because data centres were claiming a PUE below 1.0 by
  counting reused heat, which PUE's definition does not allow. Ask for PUE and ERF as separate figures; see
  [how to read PUE and WUE](/how-do-i/understand-pue-and-wue/).
- **ERF does not measure benefit.** A high ERF says heat was handed over, not what it replaced. Heat that displaces
  gas boilers saves more carbon than heat that displaces another low-carbon source, and the heat pumps' electricity
  has its own footprint.

## What do the rules say?

**The EU requires data centres to report heat reuse and, above 1 MW, to use waste heat where feasible; Germany sets
minimum reuse shares; England plans to let heat network zones require connection.** Rules change; dates below are
as checked on 26 November 2026.

- **EU reporting.** The recast Energy Efficiency Directive (EU) 2023/1791, Article 12, requires data centres with at
  least 500 kW of installed IT power to publish their performance each year, including "waste heat utilisation".
  Delegated Regulation 2024/1364 sets out how, including waste heat reused and its temperature.
- **EU reuse duty.** Article 26(6) requires data centres with a total rated energy input above 1 MW to use their waste
  heat or other waste heat recovery applications, unless they show it is not technically or economically feasible.
  New or substantially refurbished data centres above 1 MW must carry out a cost-benefit analysis covering local heat
  demand, "including seasonal variation", and connection to a district heating network.
- **Germany.** The Energy Efficiency Act (EnEfG), section 11, covers data centres from 300 kW. Those starting operation
  from 1 July 2026 must reuse at least 10% of their energy, rising to a planned 15% for those starting from 1 July
  2027 and 20% from 1 July 2028, measured under EN 50600-4-6. There are exemptions, for example where a nearby heat
  network operator turns down an offer of heat at cost. A government bill (Bundestag Drucksache 21/8027) would give
  four years instead of two to meet the shares, count heat used for the data centre's own offices (which the EU
  reporting method does not), and exempt sites with no technically and economically reasonable heat network
  connection. It had its committee hearing on 5 October 2026; check whether it has passed.
- **Netherlands.** Amsterdam's data-centre siting policy for 2020 to 2030, adopted by the city council in December
  2020, includes an obligation to use waste heat among its sustainability conditions. RVO, the national enterprise
  agency, describes options from low-temperature heat-and-cold networks to direct supply to neighbours.
- **Nordic countries.** The examples above rely less on mandates than on heat utilities that buy or take data-centre
  heat for large existing district heating networks, as in Stockholm, Odense and Espoo.
- **UK (England).** In its January 2026 response on heat network zoning, the UK government said zone coordination
  bodies will investigate recoverable heat sources, naming data centres, and that if no agreement is reached a zone
  coordination body will be able to require a heat source to connect and supply heat where connection is viable.
  Zoning regulations for England were due in 2026.

For the wider policy picture, see [green AI policy](/guides/policy/).

## What can AI users and buyers ask?

**Ask for heat reuse figures alongside, not instead of, energy, carbon and water figures.** Buyers' questions shape
what operators report.

- What is the site's ERF for the last full year, and is it reported under Delegated Regulation 2024/1364?
- Who uses the heat, how much (in MWh a year) is delivered, and in which months?
- What heat source does it replace, and how much electricity do the heat pumps use?
- Is the PUE quoted without any credit for reused heat?

If a data centre is planned near you, ask the same questions at planning stage; see
[how to have a say on a data centre near me](/how-do-i/have-a-say-on-a-data-centre-near-me/).

## How do I talk about heat reuse honestly?

**Report what was delivered and what it replaced, and never present reuse as cancelling out a data centre's
footprint.**

- Quote measured heat delivered in a year, and say so when a figure is peak capacity or a plan.
- Don't claim a PUE below 1.0, or call AI "carbon neutral" because its heat is reused.
- Wasteful software makes as much heat as useful software: reuse is no substitute for efficiency.

See [honest green claims](/practice/honest-green-claims/) for the wider rules.

## What to do next

1. Ask your hosts and AI providers for each site's ERF and PUE, as separate figures.
2. If you plan a data centre, map heat users within reach before choosing the site, and leave space for a heat
   connection.
3. If you work in local or national government, plan data-centre sites together with heat networks, grid and water;
   see [how to encourage greener AI as a policymaker](/how-do-i/encourage-greener-ai-as-a-policymaker/).
4. If a data centre is proposed near you, ask who will use its heat, and when.
5. Keep cutting the energy the computing uses in the first place; see
   [green AI hosting and data centres](/practice/hosting-and-data-centres/).

## Frequently asked questions

### Can data-centre waste heat heat homes?

Yes, through a district heating network. In Stockholm, the heat utility Stockholm Exergi says it heats 11,000 apartments with excess heat, and in Odense, Meta set a goal of recovering 100,000 MWh a year, enough for 6,900 homes. Both rely on heat pumps and an existing network.

### Why don't all data centres reuse their heat?

Because the heat is warm rather than hot, it usually has to be upgraded with a heat pump, piped to a user nearby and matched to demand that falls in summer. The European Commission lists the cost of upgrading and transferring heat, unsuitable patterns of heat and a lack of heat users as the main barriers.

### Does reusing heat lower a data centre's PUE?

It shouldn't. PUE compares total facility energy with IT energy and cannot go below 1.0. Heat sent outside the data centre is counted separately, by the energy reuse factor (ERF) or energy reuse effectiveness (ERE).

### Is a data centre that reuses its heat a green data centre?

Not by itself. Reuse puts energy that would be wasted to work, but the data centre still uses the same electricity, and the computing inside can still be wasteful. Ask what heat the scheme replaces, how much is delivered in a year and how much electricity the heat pumps use.

### Do data centres have to reuse their heat by law?

In the EU, data centres with a total rated energy input above 1 MW must use their waste heat unless they show it is not technically or economically feasible. Germany sets minimum reuse shares for new data centres, and England's heat network zoning plans include a power to require heat sources to connect.

## Sources

- [Report from the Commission to the European Parliament and the Council on the energy efficiency of data centres in the EU (COM(2026) 500 final)](https://data.consilium.europa.eu/doc/document/ST-13443-2026-INIT/en/pdf), European Commission (Council document 13443/26) (2026)
- [Assessment of the energy performance and sustainability of data centres in EU: first technical report](https://data.europa.eu/doi/10.2833/3168794), European Commission, Directorate-General for Energy (AIT, Borderstep and EY) (2025)
- [Making data centres energy efficient thanks to new EU rating system](https://commission.europa.eu/news-and-media/news/making-data-centres-energy-efficient-thanks-new-eu-rating-system-2026-09-21_en), European Commission (2026)
- [Directive (EU) 2023/1791 on energy efficiency (recast)](https://eur-lex.europa.eu/eli/dir/2023/1791/oj), Official Journal of the European Union (2023)
- [Commission Delegated Regulation (EU) 2024/1364 on the first phase of a common Union rating scheme for data centres](https://eur-lex.europa.eu/eli/reg/2024/1364/oj), EUR-Lex (2024)
- [ISO/IEC 30134-6:2021 Information technology: Data centres key performance indicators, Part 6: Energy Reuse Factor (ERF)](https://www.iso.org/standard/71717.html), ISO/IEC (2021)
- [ERE: a metric for measuring the benefit of reuse energy from a data center](https://datacenters.lbl.gov/sites/default/files/EREmetric_GreenGrid.pdf), The Green Grid (2010)
- [Emergence and Expansion of Liquid Cooling in Mainstream Data Centers](https://www.ashrae.org/File%20Library/Technical%20Resources/Bookstore/Emergence-and-Expansion-of-Liquid-Cooling-in-Mainstream-Data-Centers_WP.pdf), ASHRAE Technical Committee 9.9 (2021)
- [Heat recovery](https://www.stockholmexergi.se/en/heat-recovery/), Stockholm Exergi (2026)
- [Odense Data Center 2](https://tech.facebook.com/engineering/2020/7/odense-data-center-2/), Meta (Tech at Meta) (2020)
- [Largest Danish heat pump installation utilising surplus heat from data centre](https://www.ramboll.com/en-gb/technology/projects/energy/meta-surplus-heat-to-district-heating), Ramboll (2023)
- [Espoo sold land in Hepokorpi to Microsoft for data centre project](https://www.espoo.fi/en/news/2023/12/espoo-sold-land-hepokorpi-microsoft-data-centre-project), City of Espoo (2023)
- [Green Mountain and Hima Seafood launch groundbreaking heat reuse project](https://www.mynewsdesk.com/green-mountain/pressreleases/green-mountain-and-hima-seafood-launch-groundbreaking-heat-reuse-project-3430566), Green Mountain (2026)
- [Turning waste heat into value](https://greenmountain.no/turning-waste-heat-into-value/), Green Mountain (2026)
- [Paris Region data centers: allies of the territory's ecological transition and attractiveness](https://www.chooseparisregion.org/sites/default/files/pdf/About%20us/Press%20releases/20230216-Press-Release-Choose-Paris-Region-Data-centers-Equinix.pdf), Choose Paris Region (2023)
- [Exmouth Swimming Pool is heated by a UK first in technology heating solutions](https://eastdevon.gov.uk/news/2023/03/exmouth-swimming-pool-is-heated-by-a-uk-first-in-technology-heating-solutions/), East Devon District Council (2023)
- [Restwarmte datacenters](https://www.rvo.nl/onderwerpen/restwarmte/datacenters), Netherlands Enterprise Agency (RVO) (2026)
- [Vestigingsbeleid datacenters gemeente Amsterdam 2020-2030, eerste herziening](https://odnzkg.nl/wp-content/uploads/2026/07/Vestigingsbeleid-datacenters-2020-2030-Amsterdam-Duurzaam-Digitaal-eerste-herziening.pdf), Gemeente Amsterdam (published by Omgevingsdienst Noordzeekanaalgebied) (2026)
- [Energieeffizienzgesetz (EnEfG), § 11 Klimaneutrale Rechenzentren](https://www.gesetze-im-internet.de/enefg/__11.html), Bundesministerium der Justiz (gesetze-im-internet.de) (2023)
- [Entwurf eines Gesetzes zur Beschleunigung der Umsetzung der Energieeffizienzrichtlinie (Bundesrat Drucksache 388/26)](https://dserver.bundestag.de/brd/2026/0388-26.pdf), Bundesregierung (Deutscher Bundesrat) (2026)
- [Anhörung zur Umsetzung der Energieeffizienzrichtlinie](https://www.bundestag.de/dokumente/textarchiv/2026/kw41-pa-wirtschaft-energieeffizienzrichtlinie-1218082), Deutscher Bundestag (2026)
- [Proposals for heat network zoning 2023: government response](https://www.gov.uk/government/consultations/proposals-for-heat-network-zoning-2023/outcome/proposals-for-heat-network-zoning-2023-government-response-accessible-webpage), Department for Energy Security and Net Zero (GOV.UK) (2026)
